Green Dragon Hotel CSO 481ecUnited Utilities · Warrington
Not spilling
It last stopped Aug 2026.
Last spillAug 2026
It ran for 22 min
Spills in 202519
Number 998 of 2,193 for United Utilities
Hours in 202560
About 3 days in total
Within 3 km
Other overflows close by.
- Dunham Massey Outfall CSO (451ss)River Bollin · United Utilities · 2.8 km awayStopped 9 hours ago
- Partington WWTWRed Brook · United Utilities · 2.1 km awayStopped 15 hours ago
- Dunham Massey STWRiver Bollin · United Utilities · 2.8 km awayStopped 16 hours ago
- Birch Road CSO (451ed)Manchester Ship Canal · United Utilities · 2.8 km awayStopped 18 hours ago
- Rr NO 16 Bridgewater St CSO 483brSlitten Brook · United Utilities · 2.5 km awayStopped 18 hours ago
- Dane Bank Road CSO 481qySlitten Brook · United Utilities · 2.4 km awayStopped 11 days ago
- Lock Lane Partington CSOManchester Ship Canal · United Utilities · 2.8 km awayStopped 32 days ago
- Parkgate Farm (Warburton) CSOManchester Ship Canal · United Utilities · 1.1 km awayStopped 32 days ago
- Sow Brook PSSlitten Brook · United Utilities · 2.2 km awayStopped 34 days ago
- St Helens Close CSORiver Glaze · United Utilities · 2.5 km awayStopped 34 days ago
Reference UUP00846. Position 53.3948, -2.4494. Live status is the company's own unverified reading.