Heaton Gardens Pumping StationNorthumbrian Water · South Tyneside
Not spilling
It last stopped Aug 2026.
Last spillAug 2026
It ran for 56 min
Spills in 20251
Number 1,162 of 1,498 for Northumbrian Water
Hours in 20250
of spilling in total
Within 3 km
Other overflows close by.
- South Shields Interceptor Bs/104River Don · Northumbrian Water · 3.0 km awayStopped 3 days ago
- Jarrow Slake SPSRiver Don Estuary · Northumbrian Water · 2.4 km awayStopped 9 days ago
- Station Road CSO G020River Don · Northumbrian Water · 1.3 km awayStopped 9 days ago
- Tyneside CSO (NO B5/301)River Don · Northumbrian Water · 3.0 km awayStopped 9 days ago
- Rear 3 Ernest Street CSORiver Don · Northumbrian Water · 178 m awayStopped 9 days ago
- East Boldon CSO NO 6River Don · Northumbrian Water · 2.2 km awayStopped 9 days ago
- CSO at BedeswayRiver Don · Northumbrian Water · 2.8 km awayStopped 9 days ago
- Roman Road CSORiver Don · Northumbrian Water · 2.3 km awayStopped 9 days ago
- Overflow into a tributary of River DonNorthumbrian Water · 1.2 km awayStopped 9 days ago
- Junction Langholme Avenue &River Don · Northumbrian Water · 875 m awayStopped 10 days ago
Northumbrian WatercompanySouth Tynesidecouncil areaJarrow and Gateshead EastconstituencyWhat is a storm overflow?guide
Reference NWL00662. Position 54.9561, -1.4470. Live status is the company's own unverified reading.
Bathing spots within 10 km