PS NO 3 (Suspension Bridge)Welsh Water · Isle of Anglesey
Not spilling
It last stopped 13 days ago.
Last spill13 days ago
It ran for 3 hours
Spills in 202560
Number 580 of 2,058 for Welsh Water
Hours in 2025185
About 8 days in total
Within 3 km
Other overflows close by.
- Llanfair Pg Wastewater Treatment WorksMenai Strait · Welsh Water · 2.7 km awayStopped 4 days ago
- Treborth Wastewater Treatment WorksMenai Strait · Welsh Water · 2.0 km awayStopped 9 days ago
- Overflow into the Menai StraitWelsh Water · 1 m awayStopped 13 days ago
- PS NO 1 (Faelog Causeway) (EmergencMenai Strait · Welsh Water · 854 m awayStopped 13 days ago
- Overflow into the Menai StraitWelsh Water · 854 m awayStopped 13 days ago
- Overflow into the Menai StraitWelsh Water · 2.0 km awayStopped 22 days ago
- Overflow into the Menai StraitWelsh Water · 2.8 km awayStopped 32 days ago
- Overflow into the Menai StraitWelsh Water · 2.3 km awayStopped 32 days ago
- Pont Llandegfan Sewage Pumping StatAfon Cadnant · Welsh Water · 2.8 km awayStopped 34 days ago
- Llyn y Felin PS (Emergency)Menai Strait · Welsh Water · 397 m awayStopped 35 days ago
Reference DCWW1800. Position 53.2211, -4.1636. Live status is the company's own unverified reading.
Bathing spots within 10 km